Meditek SLD Modular vs Stickbuilt Timeline

PREFAB/MODULAR

STICK-BUILT

STICK-BUILT

SLD TECHNOLOGY

TIME AND $ SAVINGS

VS

DELIVERY METHOD

EQUIPMENT/LABOR COST RATIO

INSTALLATION TIME

QTY OF ELECTRICAL CONNECTIONS

QTY OF DUCTWORK CONNECTIONS

REDUCTION OF GENERAL CONDITIONS

BOOM FOOTPRINT

DEPRECIATION TERM

DELIVERABLES MANAGEMENT

OEM SUBMITTALS

TRADES PROCESS

Prefab/Modular

85%/15%

2 Days

1-2

1-2

Yes

4 sq ft

5 years (85% of cost)

Single Vendor

Single

Parallel

Stick-built

30%/70%

20-35 Days

12+

8+

No

Greater than 80 sq ft (4 kickers required)

27.5 years (35% of cost)

Multiple Vendors

Multiple

Linear

PREFAB/MODULAR

COMPRESSED TIMELINE PROCESS

CONCEPTUAL

PLANNING

ARCHITECT

SELECTION

PRELIMINARY

DESIGN

FINAL

DESIGN

GC

BID

PERMITS

SELECT

CONTRACTOR

CONSTRUCTION

SUB

BID

SITE DEVELOPMENT,STRUCTURAL FRAMING,

STEEL, CONCRETE. MEP ROUGH IN: ELECTRICAL,

HVAC, PLUMBING, MED GAS. DRYWALL OR WALLS

& CEILING. SPECIALTY SYSTEMS: BOOMS &

EQUIPMENT FINAL CONNECTIONS.

CONCEPTUAL

PLANNING

ARCHITECT

SELECTION

PRELIMINARY

DESIGN

FINAL DESIGN

GC BID

PERMITS

SELECT

CONTRACTOR

SUBMITTAL

FABRICATION DWGS

MANUFACTURING

LAYOUT/QUOTE DWGS

FACTORY BUILT

FULLY ASSEMBLED

MODULES IN A

CONTROLLED

ENVIRONMENT

SHIPPING TO SITE

INSTALLATION

MODULAR DESIGN

SINGLE-TRADE INSTALLS

IN HOURS W/ MINIMAL

MEP CONNECTIONS

REDUCED TRADE

COORDINATION

VS

PREFAB/MODULAR VS STICK-BUILT PROJECT TIMELINE

PREFAB MODULAR

4243 SE INTERNATIONAL WAY SUITE D, PORTLAND, OR 97222 - (503) 744-0002

STICK-BUILT

CONCEPTUAL

PLANNING

ARCHITECT

SELECTION

PRELIMINARY

DESIGN

FINAL

DESIGN

GC BID

PERMITS

CONTRACTOR

SELECTION

CONSTRUCTION

PLANNING &

DESIGN

MANUFACTURING

FACTORY BUILT

FULLY ASSEMBLED

MODULES

SHIP TO SITE

INSTALLS IN

HOURS

STRUCTURAL

HVAC

ELECTRICAL

INSPECTION